Excavaotr Mounted Piling Hammer
BRUCE Base Mount
Piling Hammer
Excavaotr Mounted Impact Pile Hammer
BRUCE Base Mount Piling Hammer supply high versatility kit such as Bruce hydraulic pile hammer, leader, winches and others necessary accessory for the existing excavator, crane or piling rig as BRUCE of one of the world’s leading supplier of hydraulic pile hammer. It is cost effective concept multi-purpose designed as additional power pack is not required
The EXCAVATOR MOUNTED PILING RIG with completely original concept in Excavator Mounted Piling Rig equipment industries has been manufactured by BRUCE of one of the world leading supplier of hydraulic pile hammer.
It is a multi-purpose rig designed for piling works in confined area.
BRUCE’s unique base mount attachment and pile hammer will fulfill the needs for those people who are reluctant to purchase a high cost conventional piling rig. If you apply all of the BRUCE concepts here, your work will enjoy the powerful competitive advantage that making a great Profit on working site..
Base Mounted Pile Hammer
ELECTRIC REMOTE CONTROL SYSTEM FOR ADJUSTING IMPACT ENERGY
with Bruce piling hammer remote control system, user can control piling and failure check in base machine cabin or long distance of piling area. Abnormalities in each function are monitored on LED with high brightness signal so that diagnosis and remedy can be done quickly.
VISIBLE RAM HEIGHT MOVEMENT
Ram drop height indicator on the side of the hammer is standard equipped with height marking so that operator can see ram drop height easily during pile driving and can adjust ram height stroke during pile driving through remote control box provided
LONG-TERM RELIABILITY
Bruce hydraulic pile hammers are designed and manufactured for long life service with minimal downtime. For the purpose, accurate and precise workmanship is adopted to electric and hydraulic system ensuring low downtime on both systems and promoted endurance with hoses, cables, couplings and other related parts.
LOWER COST OF CONSUMABLE PARTS
As Bruce hammer choose only quality improved supplier of consumable parts, long life time of the parts is guaranteed. Therefore customer can save the cost from consumable parts
HIGH ENERGY EFFICIENCY & ENERGY TRANSFERRING EFFICIENCY
Compensation of energy drop efficiency during ram drop is functioning by equipped accumulator back charging system to cylinder.
PROMINENT ENERGY TRANSFERRING RATE
With the help of efficient design of pile hammer body and the cushion arrangement, impact energy from ram drop can be transferred to pile head with lower energy loss. That means the job efficiency can be maximized
LONGER LIFE TIME OF CUSHION PARTS INCLUDING BUFFER-RINGS
The well-built structure of hammer cap housing and optimum choice of cushion material ensure longer term use of cushion parts. Therefore customers can achieve the economical operation with lower running cost.